ANALYSIS OF ROAD PERFORMANCE DUE TO SIDE OBSTACLES AT PT JOMBANG – ROAD MOJOKERTO JOMBANG DISTRICT

nur cahyono, yono (2024) ANALYSIS OF ROAD PERFORMANCE DUE TO SIDE OBSTACLES AT PT JOMBANG – ROAD MOJOKERTO JOMBANG DISTRICT. Other thesis, Universitas Darul Ulum.

[thumbnail of Full Tesis] Text (Full Tesis)
S1-2024-202322201044-_Full_Tesis[1].pdf - Submitted Version
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (4MB) | Request a copy
[thumbnail of Bibliography] Text (Bibliography)
S1-2024-202322201044-Bibliography[1].pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (278kB)
[thumbnail of Abstrac] Text (Abstrac)
S1-2024-202322201044-Abstarc.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (280kB)
[thumbnail of Bab 1 introduction] Text (Bab 1 introduction)
S1-2024-202322201044- Bab1 introduction.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (414kB)

Abstract

ANALYSIS OF ROAD PERFORMANCE DUE TO SIDE OBSTACLES AT
PT JOMBANG – ROAD MOJOKERTO JOMBANG DISTRICT

nur cahyono
NIM202322201044

Abstrac
Side obstacles are activities beside the road that greatly disrupt the smooth
flow of traffic. The large number of vehicle accesses in and out of the land along
the road further increases the density of the road. Jalan Peterongan - Mojoagung
is located around the Jombang Samsat office, the location is adjacent to PT Pei
Hai International Wiratama Indonesia which is a shoe manufacturing factory,
and the number of employees is around 7000 people. When the factory
employees go home or go to work, the location experiences obstacles in the
form of side obstacles with pedestrians caused by the PT workers. Based on
this, as a researcher, I will examine the side obstacles that occur on the road
section. In this study, the method used is the Indonesian road capacity guidelines
(PKJI 2023). Based on this study, the highest traffic volume was obtained at
06:30-08:30 for the morning, and at noon 11:00-13:00 and for the afternoon
15:00-17:00. The highest volume levels are during the morning and afternoon
hours.

Item Type: Thesis (Other)
Uncontrolled Keywords: keywords : Road capacity, road performance, degree of saturation
Subjects: H Social Sciences > HG Finance
H Social Sciences > HJ Public Finance
Universitas Darul Ulum > Fakultas Teknik > Teknik Sipil
Universitas Darul Ulum > Fakultas Teknik > Teknik Sipil
Divisions: Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment
Depositing User: nur cahyono
Date Deposited: 08 Oct 2024 04:57
Last Modified: 08 Oct 2024 04:57
URI: http://repository.undar.ac.id/id/eprint/975

Actions (login required)

View Item
View Item