Road Performance Study Due to the Existence of Jombang Regency Alun Alun Park

Hidayat, Hendri (2024) Road Performance Study Due to the Existence of Jombang Regency Alun Alun Park. Other thesis, Universitas Darul Ulum.

[thumbnail of Bab I Introduction] Text (Bab I Introduction)
S1-2024-172322201082-Bab I INTRODUCTION.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (1MB)
[thumbnail of Bibliography] Text (Bibliography)
S1-2024-172322201082-REFERENCE.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (412kB)
[thumbnail of Full Tesis] Text (Full Tesis)
S1-2024-172322201082-FULL REPORT.pdf - Submitted Version
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (1MB) | Request a copy
[thumbnail of Abstrac] Text (Abstrac)
S1-2024-172322201082-ABSTRACK.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (30kB)

Abstract

Jombang is a developing city, and its economic growth is also very rapid, from year to year it can be seen from the standard of living of the people of Jombang Regency directly proportional to the needs of transportation facilities and infrastructure. Since 2021 the Jombang Regency Government is also trying to improve public facilities for services to the community, so the Jombang Regency government is rearranging the Jombang Regency square. With the construction of the Jombang Regency square park, it has resulted in several changes in the performance of the Basuki Rahmat road, KH road. A. Dahlan (Front Segment of the Great Mosque), and Diponegoro street. Due to the presence of vehicles in and out of the Jombang Regency square. Solutions to Problems that occur on the Basuki Rahmat road, KH. A. Dahlan (Front Segment of the Great Mosque), and Diponegoro street by counting volume of Basuki Rahmat street, Jalan KH. A. Dahlan (Front Segment of the Great Mosque), and Jalan Diponegoro.
This research can measure and estimate the performance of the Basuki Rahmat Street section, Jalan KH. A. Dahlan (Front Segment of the Great Mosque), and Jalan Diponegoro due to the existence of a square park on Jalan Basuki Rahmat, Jalan KH. A. Dahlan (Mosque Front Segment), and Jalan Diponegoro Jombang Regency in accordance with the 2014 Indonesian Road Capacity Guidelines (PKJI). So that it can provide driving comfort for many people.

Item Type: Thesis (Other)
Uncontrolled Keywords: road performance, road volume, PKJI 2014
Subjects: H Social Sciences > HG Finance
H Social Sciences > HJ Public Finance
Universitas Darul Ulum > Fakultas Teknik > Teknik Sipil
Universitas Darul Ulum > Fakultas Teknik > Teknik Sipil
Divisions: Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment
Depositing User: hendri hidayat
Date Deposited: 08 Oct 2024 02:57
Last Modified: 08 Oct 2024 02:57
URI: http://repository.undar.ac.id/id/eprint/938

Actions (login required)

View Item
View Item