Rahmat Faruq, Fajar (2024) PERFORMANCE STUDY OF SIGNALIZED INTERSECTION AT SENTUL TEMBELANG INTERSECTION. Other thesis, Universitas Darul Ulum.
S1-2024-202322201010-Abstrac.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (260kB)
S1-2024-202322201010- Bab I introduction.pdf - Submitted Version
Available under License Creative Commons Attribution Share Alike.
Download (381kB)
S1-2024-202322201010- Bibliography.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (452kB)
S1-2024-202322201010- Full Tesis.pdf - Submitted Version
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (3MB) | Request a copy
Abstract
Intersections are a part that must be considered in order to smooth traffic flow in urban areas because the existence of intersections cannot be avoided in urban transportation systems. The existence of intersections must be managed properly and carefully so that a good intersection is obtained. The placement of intersections is determined by location, planning, To determine the performance of the Sentul 4-way intersection, a survey and data calculation are needed using the Indonesian road capacity manual (MKJI 1997)
The results of observations obtained geometric conditions of the eastern approach intersection 4.6 meters, the northern approach 6.5 meters, the western approach 3.8 meters, the southern approach 6.5 meters. traffic flow of the eastern approach 160 pcu/hour, the northern approach 434 pcu/hour, the western approach 131 pcu/hour, the southern approach 478 pcu/hour. The capacity value of the eastern approach is 204 smp/hour, the northern approach is 481 smp/hour, the western approach is 164 smp/hour, the southern approach is 647 smp/hour. For the Dj value of the eastern approach is 0.78, the northern approach is 0.90, the western approach is 0.79, the southern approach is 0.73, the standard Dj value is <0.85 because the northern approach value is 0.90, the performance of the northern approach is unstable. To maximize the performance of the intersection, it is focused on geometric widening, so it is necessary to improve the performance of the intersection in existing conditions.
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | Peak Hour, Q Value, Dj Value (Degree of Saturation), Delay |
Subjects: | H Social Sciences > HG Finance H Social Sciences > HJ Public Finance Universitas Darul Ulum > Fakultas Teknik > Teknik Sipil Universitas Darul Ulum > Fakultas Teknik > Teknik Sipil |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment |
Depositing User: | fajar rahmat faruq |
Date Deposited: | 08 Oct 2024 04:37 |
Last Modified: | 08 Oct 2024 04:37 |
URI: | http://repository.undar.ac.id/id/eprint/866 |