Deni Wijayanto, Deni (2023) OCCUPATIONAL SAFETY AND HEALTH (K3) ON PRESERVATION CONSTRUCTION PROJECTS TUBAN-LAMONGAN-GRESIK ROAD. Other thesis, Universitas Darul Ulum.
S1-2023-182322201091-abstrak.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (106kB)
S1-2023-182322201091-BAB I Introduction.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (368kB)
S1-2023-182322201091-reference.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (346kB)
S1-2023-182322201091-Full Report.pdf - Submitted Version
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.
Download (2MB) | Request a copy
Abstract
ABSTRACT
Road infrastructure development in Indonesia continues to increase every year, in this road infrastructure development project there are several important elements involved in the development itself, especially human resources. Human resources involved in an infrastructure development project are regulated and controlled in the field of management systems so that human resources in a project can be applied efficiently and effectively. in the management system section there is an Occupational Safety and Health (K3) aspect where this aspect is very necessary in a construction project in order to reduce the level of work accidents on a project. In this research, the regulatory reference base used is the Republic of Indonesia Government Regulations Concerning Occupational Safety and Health Systems (SMK3) as well as the Minister of Manpower and Transmigration Regulations Concerning Occupational Safety and Health and these regulations will be reviewed again on the implementation of Occupational Safety and Health until they obtain results that are in accordance with implementation in the field with SMK3 regulations.
This research was carried out by distributing questionnaires to Tuban-Lamongan-Gresik road construction project workers. With the results of distributing questionnaires to a total of 35 respondents who had their respective roles/tasks in the construction project. Data analysis was carried out in Microsoft Excel, which then processed the data using mean calculations to determine the average value of the distribution of the questionnaire and standard deviation to measure deviations in the size of the mean which has a tendency to produce the same results with different deviations, measurement of deviations to show the high and low differences in the data obtained. .
Item Type: | Thesis (Other) |
---|---|
Uncontrolled Keywords: | K3 planning, K3 implementation, obstacles to implementing K3 |
Subjects: | Universitas Darul Ulum > Fakultas Teknik > Teknik Sipil Universitas Darul Ulum > Fakultas Teknik > Teknik Sipil T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment |
Depositing User: | Deni Wijayanto |
Date Deposited: | 16 Oct 2023 06:36 |
Last Modified: | 16 Oct 2023 06:36 |
URI: | http://repository.undar.ac.id/id/eprint/189 |