ARRANGEMENT OF THE KEBON ROJO PARK INTERSECTION MODEL JL. RAYA KH. WAHID HASYIM JOMBANG DISTRICT

M. Hafis Rofi'ud Darojat, Hafis (2023) ARRANGEMENT OF THE KEBON ROJO PARK INTERSECTION MODEL JL. RAYA KH. WAHID HASYIM JOMBANG DISTRICT. Other thesis, Universitas Darul Ulum.

[thumbnail of Abstrac] Text (Abstrac)
S1-2023-182322201003-Abstrac.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (190kB)
[thumbnail of Bab 1 Introduction] Text (Bab 1 Introduction)
S1-2023-182322201003-BAB I Introduction.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (15kB)
[thumbnail of Reference] Text (Reference)
S1-2023-182322201003-Reference.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (115kB)
[thumbnail of Full Report] Text (Full Report)
S1-2023-182322201003-Full Report.pdf - Submitted Version
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (11MB) | Request a copy

Abstract

Intersections are a part that must be considered in order to smooth the flow
of transportation in urban areas because the existence of intersections is unavoidable in the urban transportation system. The existence of intersections must be managed
carefully so that a good intersection is obtained. The placement of the intersection is determined by its location, planning, and role in the regulation and control of the
movement of traffic. Delays in Taman Kebon Rojo, Jombang Regency, cannot be
avoided, especially at intersection points, both on main roads and on small roads. To find out the performance at the Taman Kebon Rojo intersection, surveys and data
calculations are needed. The data calculations here use the Indonesian Road
Capacity Guidelines (PKJI 2014).
The calculation results obtained (1) show that the geometric condition of the North Approach intersection is 15.20 m wide, the South Approach is 15.20 m wide, the West Approach is 8 m wide, and the East Approach is 8 m wide. (2) The total
known volume of the North Approach is 350 cu ft/hour, the South Approach is 454 cu ft/hour, the West Approach is 317 cu ft/hour, and the East Approach is 327 cu
ft/hour. (3) After analyzing the volume, it is known that the degree of saturation in
the north approach is 0.36, the south approach is 0.60, the west approach is 0.65,
and the east approach is 0.67. (4) The degree of saturation is still below 0.85, so it
can be concluded that the performance is still decent and stable, but the degree of
saturation is close to 0.85, so it is recommended to redesign. To maximize the
performance of the intersection, changes to the turning radius, cycle time, and stop
line at the intersection are focused on reducing delays, reducing queue length,
reducing the degree of saturation, and maximizing performance.

Item Type: Thesis (Other)
Uncontrolled Keywords: Delay, Survey, Arrangement Model.
Subjects: H Social Sciences > HE Transportation and Communications
Universitas Darul Ulum > Fakultas Teknik > Teknik Sipil
Universitas Darul Ulum > Fakultas Teknik > Teknik Sipil
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment
Depositing User: M. Hafis Rofi'ud Darojat
Date Deposited: 16 Oct 2023 10:37
Last Modified: 16 Oct 2023 10:37
URI: http://repository.undar.ac.id/id/eprint/104

Actions (login required)

View Item
View Item