Examination of Functional Expenses of Weighty Hardware and Work in Exercises Standardization of Upt PSDA for Jombang Regime Contextual analysis of Standardization of Afvour Ring Waterway, Sumobito Ngotok Trench

FERI SUHANDI HARAHAP, ANGGA (2023) Examination of Functional Expenses of Weighty Hardware and Work in Exercises Standardization of Upt PSDA for Jombang Regime Contextual analysis of Standardization of Afvour Ring Waterway, Sumobito Ngotok Trench. Other thesis, Universitas Darul Ulum.

[thumbnail of Abstrac] Text (Abstrac)
S1-2023-182322201089-Abstrac.pdf
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (135kB)
[thumbnail of Bab 1 Introduction] Text (Bab 1 Introduction)
S1-2023-182322201088 - Bab I Introduction.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (142kB)
[thumbnail of Bibliography] Text (Bibliography)
S1-2023-182322201088 - Reference.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (137kB)
[thumbnail of Fullreport] Text (Fullreport)
S1-2023-182322201089 - Full Report.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (11MB) | Request a copy

Abstract

Abstract
Dynamic Jombang Rule is one of the areas that has a few waterways spread across a few sub-locale, in light of BPS information (2018) states that the quantity of streams spread across Jombang Regime is 42 waterways. In light of the East Java BMKG report, the estimate for the blustery season will happen in East Java territory in 2022/2023 (karangploso.jatim.bmkg.go.id) so there is a requirement for standardization of streams in the Jombang Rule region. As per Ariani, (2021) waterway standardization is one of the exercises that means to fix and reestablish the typical capability of the actual stream, as well as conquered the issue of flooding in areas around the stream.
This study expects to figure out how much the efficiency expenses of weighty hardware earthmovers are, how much work costs are, the way lengthy it takes to finish standardization work and which PC - 200 tractor is more compelling with a land and/or water capable backhoe while chipping away at standardization
The efficiency cost of the tractor weighty hardware and work costs while finishing standardization work is Rp. 922,743,000/17 days, pay gave 23.715.000/17 days with time to finish standardization work is 17 days, in standardization work where Komatsu PC-200 Tractors are viable and 2x (twofold) quicker than Komatsu Land and/or water capable Backhoes in handling.

Item Type: Thesis (Other)
Uncontrolled Keywords: Examination of Functional Expenses of Weighty Hardware and Work in Exercises Standardization of Upt PSDA for Jombang Regime Contextual analysis of Standardization of Afvour Ring Waterway, Sumobito Ngotok Trench
Subjects: Universitas Darul Ulum > Fakultas Teknik > Teknik Sipil
Universitas Darul Ulum > Fakultas Teknik > Teknik Sipil
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment
Depositing User: angga feri suhandi harahap
Date Deposited: 26 Oct 2023 04:15
Last Modified: 26 Oct 2023 04:15
URI: http://repository.undar.ac.id/id/eprint/315

Actions (login required)

View Item
View Item