BANJARSARI PERMANENT DAM PLANNING, BARENG VILLAGE, BARENG DISTRICT, JOMBANG REGENCY.

Rhukmah Lailatul Umrhoh, Rhukmah (2023) BANJARSARI PERMANENT DAM PLANNING, BARENG VILLAGE, BARENG DISTRICT, JOMBANG REGENCY. Other thesis, Universitas Darul Ulum.

[thumbnail of Abstrac] Text (Abstrac)
S1-2023-182322201065-Abstrac.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (123kB)
[thumbnail of Bab I Introduction] Text (Bab I Introduction)
S1-2023-182322201065-Bab I Introduction.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (550kB)
[thumbnail of Reference] Text (Reference)
S1-2023-182322201065-Reference.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (292kB)
[thumbnail of Full Tesis] Text (Full Tesis)
S1-2023-182322201065-Full Report.pdf - Submitted Version
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (23MB) | Request a copy

Abstract

The Banjarsari Permanent Weir is located in Bareng Village, Bareng District, Regency Jombang, is the use of water supplies from the Gogor River for supplies raw water, especially for the benefit of the agricultural sector with a large area 132 Ha rice field. The step in planning this weir is to carry out an analysis hydrology to determine the planned flood discharge. Flood discharge calculation results
The plan is then used for hydraulic and structural analysis of the weir. After weir construction planning, weir stability control is carried out overturning, shearing, eccentricity and soil bearing capacity. This research uses data secondary in the form of daily rainfall data for 10 years from 3 stations, Based on the results of the analysis and planning of the Banjarsari Dam, the discharge was obtained
Q50 design flood is 286.41 m3 /sec. Weir dimensions with effective width the weir is 21 meters, the round type lighthouse is 6.3 meters high and the USBR Type III stilling pool with a total length of 16 meters, results of stability analysis with loads and moment that acts on the weir, it can be seen that the weir is safe
against overturning, the weir is safe against sliding, and the weir is safe against falling.
Keywords: Planning, Fixed Dam, Flood Discharge.

Item Type: Thesis (Other)
Uncontrolled Keywords: Planning, Fixed Dams, Flood Discharge
Subjects: Universitas Darul Ulum > Fakultas Teknik > Teknik Sipil
Universitas Darul Ulum > Fakultas Teknik > Teknik Sipil
T Technology > T Technology (General)
T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Faculty of Engineering, Science and Mathematics > School of Civil Engineering and the Environment
Depositing User: Rhukmah Lailatul Umrhoh
Date Deposited: 23 Oct 2023 01:13
Last Modified: 23 Oct 2023 01:13
URI: http://repository.undar.ac.id/id/eprint/295

Actions (login required)

View Item
View Item