PLANNING STUDY OF JOMBANG KULON RIVER NORMALIZATION AS FLOOD CONTROL EFFORT IN KEPATIHAN VILLAGE, JOMBANG DISTRICT, JOMBANG REGENCY

Sunardi, nardi (2021) PLANNING STUDY OF JOMBANG KULON RIVER NORMALIZATION AS FLOOD CONTROL EFFORT IN KEPATIHAN VILLAGE, JOMBANG DISTRICT, JOMBANG REGENCY. Other thesis, Universitas Darul Ulum.

[img] Text (Abstrac)
S1-2021-162322201050-Abstrac.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (85kB)
[img] Text (Bab I Introduction)
S1-2021-162322201050-Bab I Introduction.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (411kB)
[img] Text (Bibliography)
S1-2021-162322201050-Reference.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (484kB)
[img] Text (Full Tesis)
S1-2021-162322201050-Full Tesis.pdf - Submitted Version
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (7MB) | Request a copy

Abstract

ABSTRACT
Flooding is a condition in which areas that are not normally inundated by water become inundated. And such a situation is very detrimental both morally and materially, such as the obstruction of transportation routes which have an impact on the pace of the economy of a region.
In Jombang Regency, flooding occurred causing inundation to occur at several points. This happens because one of the rivers in Jombang Regency, namely the Jombang Kulon River which is located in Jagalan Hamlet, Kepatihan Village, Jombang Regency is no longer able to work properly to accommodate flood discharge. This opinion was taken after doing some research and calculations. What was initially done was to measure the rainfall that occurred in Jombang Regency, then from the results of the rainfall measurements, the planned flood discharge was obtained. This flood discharge will be compared with the ability of the Jombang Kulon River so that sections that are not able to accommodate flood discharge will be obtained. There are several causes of flooding and one of them is sediment. In addition, steps that can be taken to overcome sediment deposits are by way of River Normalization Planning.
From the studies and calculations that have been carried out, the solution to this problem is the need for a new drainage channel to cope with flooding in the village. The results obtained are as follows: Existing debit (Qex) = 22,635/s Planned debit (Qrenc) = 37.39 m3/sec. Jombang Kulon River Sediment Volume = 336,863 m³, New Channel cross-sectional dimensions profile b=10 m, d=4.00 m and w=1.00 m.
Keywords: Normalization, river, flood control.

Item Type: Thesis (Other)
Uncontrolled Keywords: Keywords: Normalization, river, flood control.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
University Structure > Fakultas Teknik > Teknik Sipil
University Structure > Fakultas Teknik > Teknik Sipil
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: sunardi sunardi
Date Deposited: 13 Oct 2021 09:35
Last Modified: 13 Oct 2021 09:35
URI: http://repository.undar.ac.id/id/eprint/1530

Actions (login required)

View Item View Item