ANALYSIS OF FLOOD MANAGEMENT AFVOUR GABUS IN REJOAGUNG VILLAGE, PLOSO DISTRICT, JOMBANG REGENCY

Ragils, Agus (2021) ANALYSIS OF FLOOD MANAGEMENT AFVOUR GABUS IN REJOAGUNG VILLAGE, PLOSO DISTRICT, JOMBANG REGENCY. Other thesis, Universitas Darul Ulum.

[img] Text (Abstrac)
S1-2021-172322201088-Abstrac.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (125kB)
[img] Text (Bab I Introduction)
S1-2021-172322201088-Bab I Introduction.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (190kB)
[img] Text (Bibliography)
S1-2021-172322201088-Bibliography.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (130kB)
[img] Text (S1-2021-172322201088)
S1-2021-172322201088-Full Report.pdf
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (9MB) | Request a copy

Abstract

Afvour Gabus which passes through Losari Hamlet, Rejoagung Village, Ploso District, Jombang Regency is one of the rivers that has a very important function, surrounded by residential areas and vast rice fields so that it demands the maximum function of the river. Currently, the cross-sectional conditions in Afvour Gabus have largely reduced its capacity due to the large amount of sedimentation deposits and besides that, at Afvor Gabus there is a confluence of water flows (intersections) from Afvor Gabus, causing slow water flow. The sedimentation of the river and the intersection of the water flow causes the capacity of the river to decrease, resulting in overflow of river water and is the main cause of flooding in residential areas and people's rice fields.
The data needed is in the form of rainfall data and existing discharge. Hourly rain intensity was obtained from the data of the annual maximum daily rainfall of the Rejoagung rain station, Tapen which was transformed using the Gumble Method formula. Existing discharge is obtained using the field measurement method while the planned discharge for Q10 years uses the Weduwen method.
From the studies and calculations that have been carried out, the solution to this problem is the need to strengthen the embankment to cope with flooding in Afvour Gabus. The results obtained are as follows: Existing debit (Qex) = 17,374 /sec Planned debit (Qrenc) = 28,082 m3/sec. Cork Afvor Sediment Volume = 19,257 m³ , New Channel cross-sectional dimensions profile b1=10 m, b2=8.00 m and h= 2.5 m. Q = A .V = 22.50 x 1.5 = 33.75 m3/s.

Item Type: Thesis (Other)
Uncontrolled Keywords: Normalization, Reinforcement, Existing Discharge, Planned Discharge.
Subjects: H Social Sciences > HG Finance
University Structure > Fakultas Teknik > Teknik Sipil
University Structure > Fakultas Teknik > Teknik Sipil
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Agus Rury Ragils Setiawan
Date Deposited: 10 Oct 2021 08:14
Last Modified: 10 Oct 2021 08:14
URI: http://repository.undar.ac.id/id/eprint/1505

Actions (login required)

View Item View Item