PERENCANAAN ULANG TATA LETAK FASILITAS PRODUKSI UNTUK EFISIENSI WAKTU ALIRAN BAHAN PADA PROSES INJEKSI DENGAN METODE SYSTEMATIC LAYOUT PLANNING DI CV. FUN SINAR JAYA MANDIRI KABUPATEN SIDOARJO

FATCHUR ROHMAN, HANIFAN (2021) PERENCANAAN ULANG TATA LETAK FASILITAS PRODUKSI UNTUK EFISIENSI WAKTU ALIRAN BAHAN PADA PROSES INJEKSI DENGAN METODE SYSTEMATIC LAYOUT PLANNING DI CV. FUN SINAR JAYA MANDIRI KABUPATEN SIDOARJO. Other thesis, Universitas Darul Ulum.

[img] Text (ABSTRACT)
S1-2021-202321201018-ABSTRACT.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (7kB)
[img] Text (Bab I Introduction)
S1-2021-202321201018-BAB 1.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (20kB)
[img] Text (Bibliography)
S1-2021-202321201018-BIBLIOGRAPHY.pdf - Submitted Version
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (12kB)
[img] Text (Full Thesis)
S1-2021-202321201018-COMPLETE.pdf - Submitted Version
Restricted to Repository staff only
Available under License Creative Commons Attribution Non-commercial Share Alike.

Download (5MB) | Request a copy

Abstract

CV. Fun Sinar Jaya Mandiri is a company engaged in manufacturing that was founded in 2009, which produces various types of plastic cup products. The problems faced by CV. Fun Sinar Jaya Mandiri is currently paying less attention to the layout of production facilities, resulting in very long material transfer distances and how to shorten the material transfer distance. The purpose of this study is to propose improvements to the layout of production facilities so as to shorten the distance of material transfer. The method used in redesigning the layout of production facilities is Systematic Layout Planning. It is expected to expedite the production process and shorten the material handling distance. The results obtained in this layout redesign is to shorten the material transfer distance from 272.1 m to 90.7 m.

Item Type: Thesis (Other)
Uncontrolled Keywords: Facility Layout, Systematic Layout Planning, Material Handling.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TJ Mechanical engineering and machinery
University Structure > Fakultas Teknik > Teknik Mesin
University Structure > Fakultas Teknik > Teknik Mesin
Divisions: Fakultas Teknik > Teknik Mesin
Depositing User: Hanifan Facthur Rohman
Date Deposited: 08 Sep 2021 07:17
Last Modified: 08 Sep 2021 07:17
URI: http://repository.undar.ac.id/id/eprint/1410

Actions (login required)

View Item View Item